ELECTRA N°306
October 2019

Featured
in this edition N°306

 

This edition is available in PDF version only

Edito

  • How Working Groups work - By Rob Stephen, President of CIGRE

Global Connections

  • CIGRE: A single port of call for end to end power system expertise!
  • Navigating Canada’s Energy Transition
  • Q&A with Merryn York, CEO Powerlink Queensland

Life of Association

  • CIGRE Brazil - XVIII ERIAC - Foz do Iguaçu - May 2019
  • Clark GELLINGS, recipient of the Charles H. Percy Award for Public Service
  • ISH - 21st International Symposium on High Voltage Engineering - Budapest - August 2019

Annual Reports

  • C4 - Power system technical performance
  • C5 - Electricity markets and regulation

Reference Paper

  • Defining power system resilience

Working Group Report

  • WG A1.34 - Testing voltage of doubly-fed asynchronous generator-motor rotor windings for pumped storage system

Technical Brochures

  • 772 - WG A1.37: Turbogenerator stator windings support system experience
  • 773 - WG B1.52: Fault location on land and submarine links (AC & DC)
  • 774 - WG A1.31: State of the art of stator winding supports in slot area and winding overhang of hydro generators
  • 775 - WG C1.35: Global electricity network - Feasibility study 
  • 776 - WG A1.50: Factory quality assurance testing requirements for turbo-generator components – stator bars
  • 777 - WG B3.42: Reliability analysis and design guidelines for LV DC auxiliary systems
  • 778 - JWG C2/C5.05: Reliability standards and market rules related to maintaining reliability and market efficiency